Release Date
Document Subject Area
Event Analysis
CRSTT Use Case
Description
A 69Kv line trip occurred during a storm where the fault was cleared properly by the line protective equipment. Within seconds an area generator trip was observed. When comparing the synchrophasor data it was clear that the unit trip occurred within cycles of the transmission fault indicating the two events were most likely related.
Reference Document File